Skip to the edition
The Premium World for Premium CompaniesThe Premium World for Premium CompaniesThe Premium World for Premium CompaniesThe Premium World for Premium CompaniesThe Premium World for Premium CompaniesThe Premium World for Premium CompaniesThe Premium World for Premium CompaniesThe Premium World for Premium Companies

The World of Aviation & Aerospace Nation

Where the World of Aviation & Aerospace Comes to Connect

  • Jet-A 92.40 $/bbl −1.80
  • ASK index 118.6 idx +0.6
  • Shop turn 96 days +4
  • Freighter 2.41 $/kg +0.07
  • Allowance 64.10 € −0.40
  • Full tape

Global edition · the front

A long-haul twin-aisle on a positioning leg over open water. Cabins are full. Delivery dates are not.

Breaking

Live file

Long-haul is selling. The aircraft to fly it are arriving late.

Network planners at three Atlantic carriers say the 2027 summer is now a metal problem, not a demand problem, after another slip in high-bypass engine-shop slots.

  • Fan-shop turns on the latest high-bypass engines are averaging 96 days.
  • Two lessors are offering interim lift at a winter premium through 2027.
  • Cabin retrofits are full, so density — not new metal — has to carry the peak.

Derby7 min

Tomasz Biel, Aerospace correspondent

The wire

In the file

Space & orbit

Section